Aspen, Colorado
The Paepcke Auditorium renovation consisted of upgrading the building envelope, significantly improving accessibility, and improving performance capabilities. The auditorium was expanded and reconfigured to provide accessible seating and access to the stage, as well as increase audience capacity and improve acoustics. New theatrical lighting and controls were also installed. The project included the installation of a stream-fed geothermal exchange system and is LEED Silver Certified.